Annex 1 General requirements of RTN Landing Platform Dock (LPD)
1.1 Type : LANDING PLATFORM DOCK : LPD
1.2 Project : 2 Ships ; Project period : 2006 - 2010
1.3 Capability Needs
1.3.1 Amphibious transport
1.3.2 Disaster relief, Evacuation operations, Humanitarian assistance and civil support
1.3.3 Search and Rescue
1.3.4 Training
1.4 General Characteristics and Specification
1.4.1 Displacement 6,000 ? 9,000 Tons (full load)
1.4.2 Max continuous speed not less than 20 knots
1.4.3 Range : not less than 5,000 NM at economic speed 15 knots
1.4.4 Endurance at least 45 days
1.4.5 Operation at sea up to sea state 6
1.4.6 The vessel?s aviation support for helicopter weight up to 22,000 pounds
1.4.7 Propulsion system Diesel engine
1.4.8 Armament Main gun 76 mm. with fire control system
Secondary guns 20 mm. and .50 inches
CIWS
1.4.9 Transport Capacity Flight Deck At least 2 spots for helicopters weight 22,000 pounds
Dock : +3 x LCM or +2 x HOVERCRAFT or 2 x Fast Interceptor
Deck : Carrying area not less than 150 m3, Space for 20AAVs and 30 Medium trucks
TROOPS : not less than 500 including ship crews
Annex 2 General requirements of RTN Large Transport Helicopter
2.1 Type : Large Transport Helicopter
2.2 Project : 4 Helos ; Project period : 2006 - 2008
2.3 Capability Needs
2.3.1 Transport troops with riffle and basic load at least 28 persons
2.3.2 Support land force operations
2.3.3 Search and Rescues
2.4 General Characteristics and Specification
2.4.1 Suitable for both sea and land operation
2.4.2 Standard designed and production helo and widely used in many Countries
2.4.3 Day and Night operations with visual and instruments
2.4.4 2 engine or more
2.4.5 Dual control capability which can be operated from either pilot or copilot position
2.4.6 Be able to install machine guns up to 30 millimeters
2.4.7 Equipped with communication system and security system conform with U.S/European standard
2.4.8 Supply support for operation at least 20 years
Annex 3 General requirements of RTN Offshore Patrol Vessel
3.1 Type : Offshore Patrol Vessel
3.2 Project : 4 ships ; Project period : 2009 ? 2012
3.3 Capability Needs
3.3.1 Patrol/Surveillance
3.3.2 Search and Rescues
3.3.3 Law enforcement at sea
3.4 General Characteristics and Specification
Displacement 1,000 ? 2,000 tons (full load)
Max continuous speed not less than 25 knots
Range : not less than 3,500 NM at economic speed 20 knots
Endurance at least 20 days
Operation at sea up to sea state 5
The vessel?s aviation support for helicopter weight 22,000 pounds
Propulsion system : Diesel engines
Weapons : Main gun 76 mm. With fire control system
: Secondary and CIWS 20 mm. And .05 inch.
: be able to install surface ? to ? surface missile; surface ? to ?air missile and decoy
system when require.
Complete surveillance and identification system for day and night operations
Supply support for operation up to 30 years.
Annex 4 General Requirement of RTN Transport aircraft
4.1 Type : Transport aircraft
4.2 Project : 3 aircrafts Project period : 2009-2011
4.3 Required Capability
4.3.1 Transportation of military material, vehicles ,troops
4.3.2 Maritime patrol
4.4 General Characteristics and Specifications
4.4.1 Day and night operations
4.4.2 Maximum cruising speed over 350 knots
4.4.3 operational range over 2000 nm. at maximum load
4.4.4 rear part of fuselage enable to open for military materiel transport and maximum carry weight over 8000 pounds
4.4.5 able to take-off in short of runways distance
4.4.6 Must be designed and provisioned for installation of maritime surveillance radar ,missile approach warning system and anti surface?to-air missile system without modification to fuselage or other main components of the aircraft
4.4.7 Supply support for operation at least 20 years
Annex 5 General Requirement of RTN UAV
5.1 Type : UAV
5.2 Project : 1 system(3 control systems/ 9-12 UAV ) Project Period 2009-2011
5.3 Required Capability
5.3.1 maritime and land reconnaissance
5.3.2 Identification and targeting for surface ship/land forces
5.4 General Characteristics and Specifications
5.4.1 day and night operation
5.4.2 operational range over 100 nm.
5.4.3 Detection radar and optical instrument equipped
5.4.4 Picture and VDO recorder
5.4.5 Real Time display
5.4.6 Supply support for operation at least 15 years
Annex 6 General requirements of RTN Frigates
6.1 Type : Light Frigate
6.2 Project : 2 ships ; Project period : 2006 - 2010
6.3 Capability Needs
6.3.1 Anti surface ships more than 50 NM.
6.3.2 Anti Air threats up to medium range.
6.3.3 Anti Submarine
6.3.4 Electronic warfare
6.3.5 Gunfire support
6.3.6 Search and Rescues
6.4 General Characteristics and Specification
6.4.1 Displacement (Full Load) 2,000 ? 3,000 tons
6.4.2 Max. continuous speed not less than 25 knots
6.4.3 Range : not less than 4,000 NM. at economic speed 18 knots
6.4.4 Endurance 15 days or more
6.4.5 Operation at sea up to sea state 5
6.4.6 Helo platform and hangar that support Helo operations size up to 22,000 lb.
6.4.7 Propulsion system : CODAD or CODOG
6.4.8 Weapons : Surface-to-Surface missile; Surface-to-Air missile; Torpedoes
:
: CIWS
: Decoy system.
6.4.9 Command and Control system : integrated system
6.4.10 External, Internal and Visual RTN standard Communication systems
6.4.11 Supply support for operation up to 30 years.
Annex 7 General Requirement of RTN Shipborne Helicopters
7.1 Type : Shipborne Helicopter
7.2 Project : 4 helos Project period : 2010-2012
7.3 Required Capability
7.3.1 Anti submarine warfare and anti surface warfare
7.3.2 Maritime patrol and Over The Horizon Targeting (OTHT )
Annex 8 General Requirement of RTN maritime attack aircraft 8.1 Type : Maritime attack aircraft 8.2 Project : 8 aircrafts Project Period 2010 ?2012 8.3 Required capability 8.3.1 Attack surface ships and maritime targets 8.3.2 Air defense for naval forces 8.3.3 Closed air support 8.4 General Characteristics and Specifications 8.4.1 Day and night operation 8.4.2 Operational range over 300 nm. 8.4.3 Over 40 nm.of air-to ?surface missile range equipped 8.4.4 Anti ground and maritime target bomb equipped 8.4.5 air- to - air missile equipped Supply support for operation Annex 9 General Requirements of RTN Submarine 9.1 Type : Conventional/Diesel ? Electric powered Submarine 9.2 Project : 2 ships ; Project period : 2012-2017 9.3 Capability Needs 8.3.1 Attack Surface ship 8.3.2 Anti- Submarine operations 8.3.3 Mine laying 8.3.4 Transport special force 9.4 General Characteristics and Specification 9.4.1 Submerged displacement 1,000 ? 2,500 tons 9.4.2 Endurance : a range of not less than 2,500 NM : a duration of operation at sea of not less than 15 days Propulsion system are diesel ? electric including AIP system Complete Navigation system for surface and subsurface operations An integrated communication system (External and internal) and GMDSS system Sensors : passive sonar and/or active sonar : electronic warfare system : 2 typs of periscope attack and search with IR/TV camera and VDO recording Weapons : Torpedo at least 6-8 tubes with reload capability : Counter measure and Decoy Annex 10 General Requirement of RTN SAM 10.1 Type : Surface- to-air missile for land forces air defense 10.2 Project : 4 systems Project period 2014-2016 10.3 Required Capability 10.3.1 Air defense ops 10.4 General Characteristics and Specifications 10.4.1 Mobile model ,wheeled propulsion 10.42 IFF equipped 10.4.3 Auto engagements (detection tracking and firing) for day and night and all weather conditions 10.4.4 Missile effective range over 10 nm. 10.4.5 Able to integrate/uplink with other air defence systems เพื่อนๆ ลองเดากองทัพเรือดูน่ะ ลองวิเคาะห์กันดูน่ะครับ ไม่อยากรอ หวยกองทัพอากาศแล้วครับ มาซื้อหวยกองทัพเรือดีกว่า เงียบๆ แต่มาเลย เช่น... 1. LPD ต่อจากสิงคโปร์ 1 ลำ 2. OPV ขนาด 2,000 ตัน ต่อภายในประเทศ อีกไม่นานคงทราบว่าเป็นอู่ไหน 3. Frigate 2 ลำ โครงการณ์น่าจะเป็นปีหน้าครับ... 4. อื่นๆ..................เงียบมากๆ ครับ... ตอนแรกมีข่าวออกมาว่าเรือ LPD ที่กองทัพเรือจะสั่งต่อ 2ลำนี้จะต่อที่จีนครับ แต่จากข้อมูลของคุณhighskygate ว่าเรือชั้นนี้จะต่อที่สิงค์โปร์ 1ลำ นี้ถ้าดูจากคุณสมบัติของเรือตามโครงการที่มีออกมานั้นเรือชั้นนี้น่าจะใกล้เคียงกับเรือชั้น Endurance ของสิงคโปร์ครับ ส่วนตัวคิดว่าเรือชั้นนี้อาจจะมีหมายเลขเรือขึ้นต้นด้วย "1" ก็ได้ครับครับซึ่งเป็นเลขที่กำหนดสำหรับเรือบัญชาการและสนับสนุนการยกพลขึ้นบก ("111" เลขสวยดี) เรือที่จะต่อเอง 2,000 ตันนี่เป็นเรือ OPV นี่ครับ ไม่ใช่ light frigate เพราะสเปก light frigate นั้นสูงมาก(ราคาต่อหน่วยก็ตั้งไว้ซะสูงมาก 15,000 ล้านบาท ดังนั้นโครงการต่อเองน่าจะเป็น OPV 100% แต่ความต้องการ 4 ลำ ดังนั้นถ้าขยายแบบชั้นปัตตานีมาใช้แล้วประสิทธิภาพน่าประทับใจ ผมว่าได้มีการของบอีก 3 ลำที่เหลือแน่นอน 4 ลำ แค่ 8000 - 9000 ล้านบาท งบ OPV เดิมสูงกว่านี้มาก คือ กว่า 20,000 ล้านบาท MEKO -100 delta ผมว่าเราต่อเองอย่างนี้ดีกว่านะครับ สนับสนุน 1 ล้าน%